QESCO New Connection

The application process for applying the QESCO new connection for you home, shop, factory, or agricultural property is exceptionally easy. You just need to submit your details, and documents to get a new QESCO connection.

Whether you are building a new property or shifting towards new rental home, you can get your new connection within 30 days if you apply the right way.

How to apply for a new QESCO Connection Online? 9 Steps Guide

QESCO is modernizing its operations. The facility of applying for new connection online is a part of this modernization. To apply for the new electricity connection, follow the given steps:

Step 1: Visit the Official Website

Go to the official website named “Electricity New Connection (ENC) System”. The URL of this website is: https://enc.com.pk/ . In the first step just open this website.

Step 2: Go to the Apply Section

At the left side of the screen you see an “Apply” button, click at it. Once you click it, you will be redirected to a new page where you will give all your details and submit the application for new electricity bill connection.

Step 3: Select the Required Information

Once you are redirected to the “New Connection Application Form”, you will see “Select Company” option. From this option, choose “QESCO“.

On the right side, you will see dropdown menu named “Sub Division”, from this dropdown choose your Sub Division. Below sub-division option, there is option of “Reference No.”, here you will put the reference no. of your neighbour.

On the left side you will see “Category Type” option, choose your category type based on your electricity load needs.

Step 4: Choose Connection Type

QESCO provides new connections in many different types / categories. Following are the connections that are provided by QESCO to its users:

  • Domestic Connections (For Homes)
  • Commercial Connections (For Businesses)
  • Industrial Connections (For Factories)
  • Agriculture and Tube well (For Farms)
  • Temporary Connection (For Short-Term Use)
  • General Services
  • Electrification Colonies
  • Street Lights
  • Corporate Company

Choose your category carefully because every category has its own taxes and charges.

Step 5: Enter the Details About You

In the “Applicant’s Particulars” section, you will provide all the details about yourself. First choose if you are a “Landlord / owner” or a “Tenant”. Then fill all the information about you, such as:

  • Your Name
  • Father’s / Husband’s Name
  • Citizenship
  • CNIC
  • Present Address
  • And your mobile number

Step 6: Contact Person Information

You need to provide another person’s contact information. This another person can be your close friend or a relative. QESCO demands these so that they can contact with somebody if you are not available. Following are the details that you need to provide:

  • Contact Person Name
  • Present Address
  • Relationship with Applicant
  • Mobile Number
  • Email

Or you can just choose “Same as above” option.

Step 7: Provide Premises Details

Now provide the information about how many meters you have already installed, how much load you need, and tell at which place you want to install this new connection.

Step 8: Upload the Required Documents

Following are the documents that you need to provide to submit the application for new WAPDA (QESCO) connection:

  • Property Document Copy
  • Attested CNIC copy of Applicant
  • Attested CNIC copy of the witness
  • Neighbour Electricity Bill Copy
  • Wiring Contratctor’s Test Report

Step 9: Review and Submit Your Application

Now you can submit your application for new electricity meter connection. But it is advised that you reconfirm all the information that you have provided. Make sure all the information you have provided is correct.

Once you are sure about the correction of provided information, tick the “I Agree” checkbox, and click “Submit”. Now your application is submitted.

Step 10: Installation of Meter

Once all of your documents and information is approved, QESCO officials will contact you, and they will install your connection.

How to apply for a new QESCO Connection at their Sub-Division Office?

If want to follow the traditional method of applying for new connection at the QESCO support center, or at their sub-division office, you can do that as well, you just need to follow the given steps:

  • Step 1: Visit the Nearest QESCO Office and get your New Connection Application Form (NC Form) from the staff members.
  • Step 2: Now carefully fill Out the Application Form. All the information that you provide must be accurate.
  • Step 3: Attach the Required Documents, such as: Copy of property ownership document, Attested CNIC copy of the applicant, Attested CNIC copy of a witness, Neighbor’s electricity bill, Wiring contractor’s test report (Electric Inspector Test Report if required) etc.
  • Step 4: Once you have filled the form, now you can submit the Application
  • Step 5: Now the QESCO staff will visit your site to verify location, wiring, and load requirements.
  • Step 6: Pay the Demand Notice (DN) at the designated bank and submit a copy of the paid DN receipt to the QESCO office.
  • Step 7: Once your payment is verified, QESCO will install your meter.

FAQs

How can I apply for a new QESCO connection online?

You can apply online through the ENC (Electricity New Connection) System at https://enc.com.pk/.

What documents are required for a new QESCO connection?

The required documents include: Property ownership document, Attested CNIC of applicant, Attested CNIC of witness, Neighbor’s electricity bill, Wiring contractor’s test report (or Electric Inspector report, if needed).

How long does it take to get a new QESCO connection?

If all documents are correct and verification goes smoothly, QESCO usually installs new connections within 30 working days.

Can I apply for a QESCO connection offline?

Yes, you can apply offline by visiting the nearest QESCO Sub-Division Office and submitting the New Connection Application Form (NC Form) manually.

Do I need my neighbor’s reference number for an online application?

Yes. While applying online, the ENC form requires the reference number of a nearby consumer to verify your area and feeder.

What is the Demand Notice (DN) and why do I have to pay it?

The Demand Notice is a mandatory fee issued after your application is approved.

Can a tenant apply for a new QESCO connection?

Yes, tenants can apply by selecting the “Tenant” option in the form and submitting the required documents, including permission from the property owner.

Will QESCO visit my property before installing the meter?

Yes, QESCO staff will conduct a site verification visit to confirm wiring, load demand, and the installation location before issuing the Demand Notice.

How will I know if my new connection application is approved?

You can check the application’s status online through the ENC portal using your tracking number, or the QESCO office will contact you once approval is complete.

Conclusion

You can submit your application for new electricity connection online and offline both. For online application you will use the following website: https://enc.com.pk/.

And for offline application you will visit your nearest QESCO office. You will provide all the required documents in both online and offline processes, and you will pay the demand notice. Once your everything is approved, your meter will be installed.